Skip to content Skip to footer

The main role of the employee:

Monitoring the quality of the works by phase of works as well as of the raw materials supplied and used, in order to obtain and deliver works complying with the own documents, the project requirements and the legislation in force.

Post Quality Control fiche

Job requirements:

 
  • Graduate of the Technical University of Construction with at least 5 years of experience in the quality field;
  • Very good PC working skills – experience working in specific systems;
  • Specific knowledge on the process of execution of construction and finishing works;
  • Good knowledge of Microsoft Office (Excel, Word);
  • Good analysis and synthesis skills
  • Active person, very well organized;
  • Autonomous person with a very well developed sense of observation
  • Initiative and proactive attitude;
  • Results-oriented and deadline-driven person;
  • Seriousness, responsibility, dynamism.
  • Willingness to travel in the territory (more than 70 % in time)

Company presentation:

Waldevar Energy, founded in 2011, specializes in the design, construction and maintenance of large-scale photovoltaic parks and has established itself on the Romanian market as one of the largest companies in the field of photovoltaic energy.
With a vast experience gained through the realization of more than 200 MW in the last 12 months, WALDEVAR Energy can execute photovoltaic parks both at home and abroad. With an execution capacity of 1MW/day and a green energy exploitation process that can be considered as a model for building the future. And sustainability, professionalism and competitiveness are the words that define our company.

Main responsibilities:

 
  • Checking the execution of works in accordance with the requirements of the law and the applicable regulations / standards in the field;
  • Ensuring the smooth running of the determinant phases and controls organized by the State Building Inspectorate (ISC)
  • Participate in the preparation of the Quality Plan for new sites, including Quality Control Plans;
  • Check that only products with conformity certificates are used
  • Check the corrections that have been made following his observations.
  • Exercises quality control of works by execution phases
  • Draws up and submits for approval the Control Programme
  • The implementation and respect of the schedule of determining phases established by the SAI;
  • Participates in checking the quality of the works in the main execution phases and signs the certification minutes
  • Quality acceptance of materials at the entrance to the site, including the performance of relevant tests/tests according to applicable regulations/standards;
  • Initiate non-conformance reports and follow up on remedial actions agreed with the Designer/Site Managers;
  • Checking the quality of the works during execution in all phases up to handover to the beneficiary;
  • Qualitative and quantitative monitoring and verification
  • Participate in the final reception of the work with the beneficiary.

Application form

How can we help you? Feel free to get in touch!